Case study · Resort furniture · Nava Raipur, Chhattisgarh
Maira Resort, Raipur: Solid Wood Furniture for 200+ Guest Rooms
Samyog Living manufactured and installed coordinated solid wood bedroom furniture for more than 200 guest rooms at Maira Resort & Convention Centre, from approved sampling in January 2023 to completion in September 2023.
200+
Guest rooms furnished
8+
Room categories
12
Pieces per room package
9 months
Sampling to completion
Project overview
One furniture standard across a 200-room resort
Maira Resort & Convention Centre in Nava Raipur needed one hotel furniture package that could be produced consistently across very different room types: Executive Twin Rooms, villas, family rooms and suites, lake-view rooms and suites, and garden-view rooms.
Dimensions, joinery, upholstery, hardware and finishes had to stay aligned across repeated production batches while each piece still fitted the layout of its room category. Samyog Living developed the resort furniture programme in premium solid wood with genuine leather upholstery and practical storage, then manufactured, checked and installed it.
This case study covers the guest-room furniture. Restaurant furniture at Maira Resort will be presented separately.
Project facts
- Client
- Maira Resort & Convention Centre (website)
- Location
- Nava Raipur, Chhattisgarh, India
- Property type
- Luxury resort and convention centre
- Scope
- Solid wood furniture for 200+ guest rooms
- Timeline
- January to September 2023
- Manufacturer
- Samyog Living, Jodhpur, Rajasthan
Room mix
8+ room categories, one production standard
Each room category had its own layout, but every piece was made from the same approved samples, finish references and upholstery specifications.
40
Executive Twin Rooms
100
Villa Rooms
8+
Room categories
- Private Villa
- Family Rooms
- Family Suites
- Lake View Rooms
- Lake View Suites
- Garden View Rooms
Guest-room furniture package
The 12-piece solid wood room package
A typical room was furnished with twelve coordinated pieces, all in premium solid wood. The bed has a genuine leather upholstered headboard. Standardised construction details, finish references and upholstery specifications let the factory repeat the approved design across a large hotel furniture order without drift.
02
Luggage rack
03
Mini fridge cabinet
04
05
Study table
06
Study chair
08
Day bed
09
Ottoman
Project execution
From approved sample to finished room in nine months
01
Sampling
January 2023
Samples fixed the proportions, joinery, materials, upholstery and finish references before bulk manufacturing began.
02
Production planning
Approved samples became repeatable manufacturing references for each room category.
03
Batch manufacturing and QC
Beds, wardrobes, cabinets, tables and seating were made in coordinated batches, then checked for dimensions, stability, joinery, upholstery, hardware and finish before dispatch.
04
Installation
Completed September 2023
Each room package was assembled and positioned on site as a coordinated set and checked against the room layout.
On-site installation
Installed room by room in Nava Raipur
Beds, bedside tables, study furniture, seating and storage were assembled and positioned by room category. These site photographs were taken before mattresses, soft furnishings and final styling went in.
Completed rooms
The finished guest rooms
The completed rooms show the furniture in use across the resort’s accommodation formats.
Completed-room photography courtesy of Maira Resort & Convention Centre. Used with permission.
Project FAQ
Maira Resort furniture project: FAQs
What furniture did Samyog Living manufacture for Maira Resort?
The guest-room package included solid wood beds with genuine leather upholstered headboards, luggage racks, mini fridge cabinets, wardrobes, study tables, study chairs, bedside tables, day beds, ottomans, coffee tables, accent chairs and TV cabinets.
How many rooms were included in the Maira Resort furniture project?
More than 200 guest rooms. The room mix included 40 Executive Twin Rooms, 100 Villa Rooms, and private villa, family, lake-view and garden-view categories.
What material was used for the guest-room furniture?
The bedroom furniture was manufactured in premium solid wood. The beds have genuine leather upholstered headboards.
How long did the Maira Resort furniture project take?
About nine months. Sampling began in January 2023 and the project was completed in September 2023.
Can Samyog Living manufacture furniture for boutique hotels and resorts?
Yes. Samyog Living develops custom furniture for hospitality projects, including boutique hotels, resorts, villas, suites and multi-room properties. See our hotel furniture and resort furniture pages.
What information is useful when requesting a hotel furniture quotation?
Floor plans, room counts, furniture schedules, technical drawings, finish references and target timelines help define the scope. Reference images also help early sampling. You can request a quote online.
Planning a similar project?
Guest-room, lobby and dining furniture made to your drawings in solid wood.
Furniture packages for resorts, villas and suites, sampled before bulk production.
Hospitality furniture
Planning a hotel or resort fit-out?
Share your floor plans, room counts, furniture schedule, drawings or reference images. Our team supports sampling, production planning, quality control and delivery for hotel and resort projects.













